Should I Require a Deposit Before Starting Work?
Yes — always. Industry standard: 25-50% depending on trade. Roofing/concrete: 30-40% (high material costs). Painting/electrical: 25-30%. Never order materials or schedule crew without a deposit. A deposit proves the client is serious and protects your cash flow.